Day #26 – 1/28/2015 – Taking a Step Back

Lab opening time 12:30 PM

Today was the second unscheduled meeting of the week,  it began like any other Wednesday during build season, a few members trickled into the lab getting ready to continue design on the base plate, and getting ready to cut the rest of the frame. Only one thing was missing, the 1″ by 2″ 1/16″ wall 6061 aluminium stock  was supposed to get delivered today, but because of multiple mistakes made by multiple people, we did not get our material.

This entire situation caused a lot of frustration for many of us, we did not want to make any critical mistakes while frustrated, so we decided to call it a day at 3:00 PM.

Lab closing time: 3:00 PM